Scope of work included the trenchless installation of a 20” smooth wall steel pipe under CN railway at the Highway 7 overpass West of Saskatoon, and the installation of a 12” HDPE fused pipe and associated valves to replace an old PVC installation. An American Augers 36-600 auger boring machine was used to install the steel pipe.